Green data centres

Lower-carbon compute, evidenced.

More buyers now set carbon and efficiency targets alongside power and density. We add them to the shortlist criteria and ask operators to evidence them in writing.

01Evidence

What we ask operators to show.

Energy source

Renewable supply arrangements and how they are contracted and certified.

Efficiency

Measured power usage effectiveness for the hall, not a design target.

Cooling

Liquid and rear-door options that cut the energy spent on cooling dense racks.

Water

Water usage and the cooling design behind it.

Grid carbon intensity

The carbon intensity of the grid behind the site, which varies widely by market.

Reporting

Data the client can use in its own sustainability reporting.

Green options are available in Malaysia and through partner facilities in wider ASEAN. Specific facilities, figures and certifications are disclosed under NCNDA.