Power basis
IT load or total facility power, stated explicitly and in writing.
Not twelve introductory calls. A shortlist of facilities that can carry your load, with usable kW, cooling architecture, cross-connect model and commercial terms stated up front.
256 air-cooled 8-GPU HGX B200 nodes: 2,048 GPUs on one in-service date. Many qualified halls cannot take that density in air, and fewer still have contiguous, contracted power on the date the client needs it.
Illustrative of the scale EOGSB works at. Client identities and facility names are never disclosed without an executed NCNDA.
nodes
B200 GPUs
IT load
total facility power
IT load or total facility power, stated explicitly and in writing.
What the rack can draw sustained, not the breaker rating.
Air, rear-door, or direct-to-chip liquid, with CDU and water-side capacity evidenced.
Tier III certified or equivalent design, concurrently maintainable, N+1 minimum.
Whether the power is contracted or aspirational, and any permitting risk behind the date.
Expansion rights, ramp schedule, escalator caps, and what it costs to leave.
From a complete requirement to a signed contract, typically four to ten weeks, depending on market and scale.
We tell you up front when an operator pays our fee, and we include facilities outside our agreements when they fit your requirement better.
On integrated supply-and-host deals, EOGSB can contract with the client for the full delivery. Terms are agreed case by case.
Yes. You do not need to buy hardware from us to use the brokerage.